Skip to content
Placer County, CA
Return to Home Placer County
  • Jobs, Benefits, and Business

    Includes veterans' benefits, starting and running a business, unemployment, County job openings, and selling to the County.

  • Law and Justice

    Includes the courts, most wanted, law enforcement, child support enforcement, sealing record, victims' services, and jury duty.

  • Building, Property, and Home

    Includes planning, building codes and permits, owning and renting a property, and property tax assessments.

  • Health and Family Care

    Includes child and adult health service, food stamps, foster care, mental health, in-home nurse, substance abuse, and child support.

  • Birth, Death, and Marriage

    Includes bereavement, certificates and vital records, and divorce.

  • Environment and Agriculture

    Includes air quality and burn days, garbage and recycling, sewer, conservation, and green energy financing.

  • Animal Services

    Includes adopting a pet, animal control, and local vets and shelters.

  • County and Government

    Includes information on the buildings, county, codes, departments, projects, representation, and voting.

  • Community and Recreation

    Includes activities and events, parks, museums, libraries, and volunteerism.

  • Taxes and Financial Reports

    Property taxes, business taxes, transient occupancy taxes, fines, and financial reports.

  • Transportation and Travel

    Includes passports, bus schedules, and road maintenance.

  • Safety and Emergency

    Includes forest fires and floods, emergency preparation, and emergency response.

Placer County Regionalizing Applegate Sewer System

June 06, 2012

Placer County Environmental Engineering is scheduled to begin construction on the Applegate Regional Sewer Pipeline Project in mid-June. This project is necessary to comply with an enforcement order from the Central Valley Regional Water Quality Control Board and includes the installation of a pump station and pipeline. The pipeline will convey Applegate’s wastewater to the existing sewer collection and treatment system located in North Auburn (Sewer Maintenance District 1).

The pump station will be constructed at Applegate Road near Merry Lane. The pipeline will run approximately 5.5 miles from the new pump station and connect to the existing collection system between Deer Run and Lodge View Drive. The route will run along the following roads: Applegate Road, Placer Hills Road, Sugar Pine Road, and Winchester Club Drive.

Construction of this project is scheduled from mid-June through January 2013 with crews normally working weekdays from 7 am – 6 pm. Residents of the affected areas can expect the following during the course of construction:

  • Large trucks and trenching equipment in roadways. Traffic-control measures will be implemented and delays are possible; however no road closures are anticipated at this time. Please allow extra travel time in your schedule.
  • Minimal impacts to driveway access and sewer service.
  • Placer Hills Road Park ‘n’ Ride will be inaccessible during part of the project; signs will be posted in advance.
  • Placer County will provide prior notification for changes to work hours, sewer service, or driveway access. Notifications will be provided via postcard, letter, or hand-delivered door hanger.

Placer County Environmental Engineering has obtained $2.1 million in grant funds from the Environmental Protection Agency for this $7.67 million project.

For more information on this project, call Placer County Environmental Engineering’s Construction Manager Walt Schwall at 530-886-4942 or visit http://www.placer.ca.gov/departments/facility/environmental-engineering/sewer.

Top