Skip to content
Placer County, CA
Return to Home Placer County
  • Jobs, Benefits, and Business

    Includes veterans' benefits, starting and running a business, unemployment, County job openings, and selling to the County.

  • Law and Justice

    Includes the courts, most wanted, law enforcement, child support enforcement, sealing record, victims' services, and jury duty.

  • Building, Property, and Home

    Includes planning, building codes and permits, owning and renting a property, and property tax assessments.

  • Health and Family Care

    Includes child and adult health service, food stamps, foster care, mental health, in-home nurse, substance abuse, and child support.

  • Birth, Death, and Marriage

    Includes bereavement, certificates and vital records, and divorce.

  • Environment and Agriculture

    Includes air quality and burn days, garbage and recycling, sewer, conservation, and green energy financing.

  • Animal Services

    Includes adopting a pet, animal control, and local vets and shelters.

  • County and Government

    Includes information on the buildings, county, codes, departments, projects, representation, and voting.

  • Community and Recreation

    Includes activities and events, parks, museums, libraries, and volunteerism.

  • Taxes and Financial Reports

    Property taxes, business taxes, transient occupancy taxes, fines, and financial reports.

  • Transportation and Travel

    Includes passports, bus schedules, and road maintenance.

  • Safety and Emergency

    Includes forest fires and floods, emergency preparation, and emergency response.

Underground Storage Tanks (UST)

Environmental Health conducts Underground Storage Tank (UST) permitting, construction plan checks, inspections, and tank closure activities.

UST repairs, modifications and upgrades are classified into two categories: 

  1. Work requiring a permit
  2. No permit required.

These categories are determined by the scope of work and the need for a site inspection.  For assistance in determining the classification of repairs to be made to your UST system please refer to the UST Installation Modification Repair Guide or contact us.

UST Work Requiring a Permit 

Prior to beginning work, you must submit a UST Permit Application.  Environmental Health will perform a technical review of the proposal, which includes:

  • Review of equipment to be used
  • Review of contractor information 
  • At minimum, one site inspection. 
  • Potential soil and/or ground water sampling. 

If the proposed work is approved, a UST Installation, Modification or Repair letter will be issued by Environmental Health to both the UST owner and the contractor. It will list site-specific construction and inspection requirements. Work may begin upon receipt of the approval letter.

No UST construction activities can proceed prior to the issuance of this letter!

Please visit our Permits, Forms, and Fees page for UST Facility permitting, Certificate of Compliance, Monitoring Plans, Response Plans and applicable fees.

UST Closure Guidelines

State of California Links

State Water Resources Control Board - UST Program

Cal EPA

UST Laws - Health & Safety Code, Division 20, Chapter 6.75

UST Regulations - California Code of Regulations (CCR), Title 23, Division 3, Chapter 16

Management of Tanks - Information on Tank Closure requirements; CCR Title 22, Division 4.5, Chapter 32

Top