Detached on a splittable lot, STEP systems – New or Existing SFD and New ADU

If there is sufficient room between the primary home and the ADU for a future parcel split, the applicant is required to install a second STEP system and connection point.

Show All Answers

1. If the ADU is detached and built at same time as the primary unit?
2. If the ADU is attached and built at same time as the primary unit?
3. If the ADU is detached and built later?
4. If the ADU is detached on a splittable lot?
5. Septic Tank Effluent Pump (STEP) Systems – Existing SFD and New ADU
6. Detached on a splittable lot, STEP systems – New or Existing SFD and New ADU